Maintenance and Recovery of green areas, Infrastructure and Highway of the Cinta Costera Stage I and II, District of Panama

Short Bid for Best Value No. 2017-0-09-0-08-AV-005049

The Directorate of Study and Design of the Ministry of Public Works makes a call for tenders.

The project consists of a length of 4.6 kilometers, starting in the road interconnection between Balboa Avenue and the new Los Poetas Avenue, from the junction with Pablo Arosemena Avenue at the end of Balboa Avenue, via the Marine Viaduct until reaching the Junction with the los Mártires Avenue in the connection with the Bridge of the Americas in Barraza.

It includes the filling over the sea that is parallel to the Poets Avenue: parking lots, elevated pedestrian crossings, bike path, green areas, courts and parks. It also includes the Mirador del Pacifico (Tourist Breakwater) with its parking lot, the elevated pedestrian passage of the Seafood Market and the elevated pedestrian crossings of Cinta Costera I and Balboa Avenue, located at the height of the Urracá Park.

The Bidding Entity may determine works that, within the execution of the work in the field, are detected as required, that have not been defined in the terms of reference and the plans, to procure the connectivity and integrality of the road networks and / or Accessibility to basic services, such as: Health centers, schools, production roads, etc., provided they are continuous, (or) adjacent, (or) perpendicular paths, at any point in the project route.

Release Date: 06/13/2017 06:33 p.m.

Date and Time Submission of Proposals: 04-07-2017 09:00 a.m. – 10:00 a.m.

Place of presentation of proposals: Meeting Room, Building 810, Ground Floor, Paseo Andrews – Albrook, Panama City

Date and time of previous meeting and homologation: 06-16-2017 11:30 a.m.

Price Reference: B /. 12,383,454.18