International Bid – Panama III Line Sabanitas – February, 2017


Project Summary

Because the near future integration of new natural gas generationplantsnatural gas generationplants at Colon province in the AtlanticBecause the near future integration of new natural gas generation plants at Colon province in the Atlantic, it is required that the existing transmission system between the Panama and Colon provinces to be reinforced to transmit this additional generation. Then it is necessary to construct a new transmission line from the Colon area, this new 230 KV transmission line will be built from the town of Sabanitas to the city of Panama (Sabanitas Panama III 230 KV); which requires the following works: a. Line Sabanitas – Panama III 230 KV: line of 230 KV, double circuit, it will have an approximate length of 50 km. b. Expansion of the 230 KV Sabanitas substation: Two (2) new bays and switches for connecting the 230 KV Panama III substation double-circuit transmission line will be required. c. Expansion 230 KV Panama III substation bays

Type of Project

230 KV Transmission Line and Substations

Project Cost

B/. 105,771,000

Project Structure

There will be a design and construction bid that will include environmental, sociological, operating and coordination studies

Program Date

February, 2017

You may also like