International Bid – Panama III 230 / 115 KV Substation – April, 2017



Project Summary

This project consists on the construction of a new 230/115 KV Panama III substation, breaker and a half circuitbreaker layout in a hybrid distribution scheme, that is switches, breakers, blades and CTs shall be SF6 encapsulated, the substation yard will be located in the Mocambo sector near Panama city.

This substation will serve as an interconnection point for new transmission lines for the distribution companies that feed the demand of through new smaller substations, and also connecting transmission lines coming from the West (LT-2 and LT-3) and the line from Sabanitas substation coming from Colon, where the future thermal power plants will be installed.

Type of Project

230/115KV Panama III Substation.

Project Cost

B/. 63,443,633

Project Structure

There will be a design and construction bid that will include environmental, sociological, operating and coordination studies

Program Date

April, 2017